Menu
Industries

Medical Equipment PCBs

In a medical device the board is approved as part of the device, so the questions that matter are not the layer count but change notification, the lot record, and whether a small lot can be built to the same standard as a production run.

  • ISO 13485:2016
  • Audit-ready lot record
  • Small lots from 1 pc

Operating theatre with a surgical robot and imaging monitors at a hospital

Certified to

  • ISO 9001:2015
  • IATF 16949:2016
  • UL No. E354070
  • IPC-6012B & IPC-A-600H

Technical Specifications

Quality system
ISO 13485:2016 · ISO 9001:2015 · UL file E354070
Lot record
One record covering bare board, material batch and assembled unit
Order size
MOQ 1 pc · prototype and pilot lots 1–50 pieces · volume quoted from the data package
Lead time
Fastest 1–3 days · standard 5–8 working days · expedited 2 working days
Scope
Bare board · component sourcing · SMT and DIP assembly · test · box build
Engineering review
DFM, DFA and DFT before the quotation is fixed
Confidentiality
NDA on request · factory visits by appointment
Payment
Bank transfer (T/T) · EXW Shenzhen or DDP

A board in a medical device is approved as part of that device. Years after the submission is filed, an auditor or a notified body can ask how a specific lot was built, and the answer has to exist. That is what ISO 13485:2016 adds to an ordinary PCB order: not a different copper weight, but a different standard of evidence.

What medical boards have to survive

Imaging and diagnostic instruments run continuously in a sealed enclosure; monitoring hardware is carried, dropped and cleaned; a wearable has to bend without breaking a trace; a sterilisation or power section can run hotter than FR-4 accepts. The substrate and finish follow that duty rather than a house default, which is why the choice is made with engineering at the stack-up stage. The published limits sit on the capability page and apply to every industry.

Where a medical board stops being a component

The same board, built to the same drawing, behaves differently once it enters a device submission. What separates the two cases is not the layer count or the substrate but where the acceptance criteria come from, and how long they have to keep holding.

  • Who defines acceptance. On an industrial order the customer drawing defines what passes; on a device the drawing is one input, and the criteria are fixed by the device validation before the board is purchased. The question that belongs in the quotation is therefore how each criterion will be measured, not only whether the process can reach it.
  • Where a change lands. An industrial revision lands on the next build. On a device it lands on a submission that already exists, so a change carries an assessment with it, which is why confirmation comes before the work rather than after it.
  • Whether the proof repeats. A passing lot proves an industrial order. A device has to show the same process again at the next lot and years later in an audit, so the process is held as fixed parameters rather than as the skill of whoever happened to run it.

The line is drawn on the submission, not on the price of the equipment. Drawn in the wrong place, the process still looks correct — what is missing only surfaces when the design history file is opened.

The lot record is the product

Fabrication and assembly share one plant, so one record follows the build from bare board to assembled unit: the stack-up, the material batch, the inspection results and the test data, without a supplier handover in the middle where responsibility changes hands. When a device submission or an internal audit asks how a board was produced, that record is the answer.

The inspection sequence behind it is the same one used for production: SPI before placement, AOI on both sides after reflow, X-ray where joints are hidden, first-article inspection against the CAD data and 100 % electrical test before packing. It is described in full on quality assurance.

Small lots without a separate process

Device development rarely starts at volume. A pilot lot of one to fifty boards runs on the production lines with the production inspection, so the board that is tested clinically is built the way the production board will be built. Once the design is frozen, the same stack-up and placement programme carry into volume, and the volume price is quoted from the data package rather than from a list.

Changes, confidentiality and visits

A change to the stack-up, finish or placement programme is quoted and confirmed in writing before it runs, and an unavailable component is replaced only after the alternative is approved. Drawings that cannot be shared openly can travel under a mutual NDA from the first exchange, and a visit to the Shenzhen or Meizhou plant can be arranged around the processes the device would use — including a look at the inspection stations that produce the lot record.

A recent programme

A 2025 build for a German EMS company shows how these points meet on one board: an 8-layer, 2+N+2 HDI remote medical sensing controller with BGA packages and an ENIG finish, running at 0.06 mm line and space. The board was sourced, assembled and tested as one order, the BGA joints were checked by X-ray, AOI and a functional test, and the samples shipped in 10 days against a date written into the agreement. The case study sets out the DFM review and the soldering controls behind it.

What a medical quotation is actually pricing

A medical quotation and an industrial one for the same Gerber set rarely differ by board area. They differ by how much of the device acceptance has been turned into a measurable step, and that work is priced alongside the fabrication.

  1. Translating device acceptance into lineside checks. First-article work, micro-sections and coupons that show the board itself meets what the device file claims, plus an inspection sequence agreed before the first lot instead of chosen at the machine.
  2. The record and its release. One lot record covering fabrication and assembly, with the images and test data behind it, issued with the goods; the sequence it documents is described in PCBA testing and quality assurance.
  3. Re-confirmation after a change. A revision returns to the confirmed state, is re-run and re-recorded, and the written confirmation that goes back to the device side is part of the work rather than paperwork around it.

Price and evidence move together here as well. An order that carries less of the second is not cheaper in total — it hands the missing part to the device programme, where it has to be rebuilt under audit pressure instead of being issued as the goods leave the line.

Next step

Send the Gerber set, the BOM and pick-and-place file if assembly is included, the quantity and the target date; a complete package is quoted within 24 to 48 hours. Board families used in device work have their own pages — flex and rigid-flex, HDI and ceramic — and turnkey assembly covers the build after the board. The certificates are on the certifications page, the rest of the industries we serve are on the industries page, and a quote can be requested on the contact page.

Frequently Asked Questions

  • What does ISO 13485:2016 change about a PCB order?

    It changes the paperwork as much as the board. Medical programmes run under ISO 13485:2016 with ISO 9001:2015 as the plant base system, so a build carries a lot record and a change is a documented event rather than an informal adjustment. The certificate scans are published on the certifications page.

  • Can a device programme start with a single board?

    Yes. MOQ is 1 pc, and a pilot lot of 1 to 50 pieces runs on the same SMT and DIP lines as production, with the same inspection sequence. A design that works at pilot quantity therefore does not have to be re-qualified for the production order.

  • What is in the lot record?

    The stack-up, the material batch, the inspection results and the test data for that build — SPI before placement, AOI after reflow, X-ray where joints are hidden, first-article results and the electrical test. Because fabrication and assembly share one plant, one record covers both stages without a handover between suppliers.

  • How are changes confirmed before the device is affected?

    A change to the stack-up, finish or placement programme is quoted and confirmed in writing before it runs, so the board and the device record do not diverge. Where a part on the BOM becomes unavailable, the alternative is proposed in writing and waits for approval.

  • What is the delivery window for a pilot or production lot?

    Fastest 1 to 3 days for a prototype, 5 to 8 working days on the standard queue, 2 working days expedited at a premium, and 4 to 10 days for medium volume. The date is confirmed on the quotation for the actual stack-up, finish and quantity.

  • Can files be shared before a purchase order exists?

    Yes. A mutual NDA can be signed before the Gerber set and BOM are exchanged, and the Shenzhen and Meizhou plants are open to customer visits by appointment. Payment is by bank transfer (T/T), with goods quoted EXW Shenzhen or DDP.

More in this section

Request a customer quote

Free engineering review and quote for PCB manufacturing, PCB assembly, component sourcing and box build.